location: Yangzhou, Jiangsu
Construction year: 2021
Construction volume: the total construction area is 79373.59 ㎡; Of which 74438.32 ㎡ are museums; Dayun Tower: 4935.27㎡; The laboratory area is 1250 ㎡; The project performance is 9.48 million yuan
location: Chongqing, China
Construction year: 2021
Construction volume: the total investment of the project is 147.2 million yuan, the total land area of the project is 53749.254 ㎡, and the total building area is 64800 ㎡; Building area of the project: 26655 ㎡, experimental room: 13005 ㎡
location: Shaoxing, Zhejiang
Construction year: 2022
Construction volume: the total building area is 154077 ㎡, the land area is 5714.79 ㎡, and the laboratory area is 22120 ㎡
location: Huai'an, Jiangsu
Construction year: 2019
Construction volume: the construction content includes the first floor to the eleventh floor, and the space includes parking lot, sample collection and retention room, microbial room, physical and chemical analysis room, warehouse, etc. The total building area is 32764 ㎡, including 27338 square meters above ground and 5426 ㎡ underground.
location: Boston, USA
Construction year: 2014-2021
Construction volume: total area: 50539 m in 8 floors ² / 544000 ft ²、 Laboratory area: 18945 m ² / 183,996 ft ²
Coordinates: Suzhou, Jiangsu
Construction year: 2022
Construction volume: the base area is 33667㎡, the total building area is 78058㎡, of which the total building area of the laboratory is 15000㎡, and the cost of the laboratory is 136 million yuan
location: Suzhou, Jiangsu
Construction year: 2022
Construction volume: the project performance is 92.88 million yuan, the laboratory area is 15000 ㎡, and the floor area is 33667 ㎡