Chongqing Institute of Food and Drug Inspection and Testing
The total investment of the project is 147.2 million yuan, with a total land area of 53749.254 ㎡ and a total building area of 64800 ㎡; The construction area of the project is 26655 ㎡, the experimental room is 13005 ㎡, the food inspection and testing center is built, and the supporting underground garage and equipment room are built.
Project introduction:
The first phase is mainly about the food inspection and testing center, a multi-functional building in 4F, which will become a; 3” A three section building. Underground garage and equipment room shall be constructed. The food inspection and testing center is equipped with experimental rooms and business rooms according to functions. The general categories of laboratories are divided into chemical laboratories, physical laboratories and microbiological laboratories. Orientation of the whole building: the whole building is“ Shanzi”, The object and goods elevator are distributed in the middle. Each strip area can be used as a laboratory area, and the middle part is a centralized office area.
Service content:
Laboratory ventilation, air supply, intelligent control system, VRV multi split air conditioning system, laboratory intelligent LEMS system, cold storage, air circuit, laboratory purification and microbe P2 laboratory system, pure water, building central control system, laboratory furniture, office furniture, etc
Case Appreciation
Lab Consultation | Planning & Design | Engineering
Copyright © 2022 DAXPRO GROUP All rights reserved. 苏ICP备2021034544号-1
Lab Consultation | Planning & Design | Engineering Copyright © 2022 DAXPRO GROUP All rights reserved. 苏ICP备2021034544号-1