Case study

Case study

Quzhou Research Institute of Zhejiang University
View
Case study

Case study

Suzhou CDC
View
Case study

Case study

Harvard University
View
Case study

Case study

CJ R&D Center, South Korea
View
CJ R&D Center, South Korea

CJ R&D Center, South Korea

location: Seoul, South Korea Year of construction: 2016 Construction volume: building area 114000 ㎡, laboratory area 65000 ㎡
Harvard University

Harvard University

location: Boston, USA Construction year: 2014-2021 Construction volume: total area: 50539 m in 8 floors ² / 544000 ft ²、 Laboratory area: 18945 m ² / 183,996 ft ²
Oujiang Laboratory

Oujiang Laboratory

location: Wenzhou, Zhejiang Construction year: 2021 Construction volume: the total construction area is about 240000 ㎡, and the laboratory area is 11000 ㎡
Quzhou Research Institute of Zhejiang University

Quzhou Research Institute of Zhejiang University

location: Quzhou, Zhejiang Construction year: 2021 Construction volume: the total investment of the project is 970.92 million yuan, the laboratory investment is 256 million yuan, and the total area of the experimental room is 42000 ㎡.
Hubei University for Nationalities

Hubei University for Nationalities

location: Enshi, Hubei Construction year: 2019 Building volume: the total building area is about 12288.6 ㎡, and the number of floors: the building height is 18.48 meters, the number of floors above the ground is 5, and some floors are suspended.
上一页
1

Lab Consultation | Planning & Design | Engineering   

Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

Lab Consultation | Planning & Design | Engineering                               Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

DAXPRO