Case study

Case study

Quzhou Research Institute of Zhejiang University
View
Case study

Case study

Suzhou CDC
View
Case study

Case study

Harvard University
View
Case study

Case study

CJ R&D Center, South Korea
View
Chengda Pharmaceutical R&D Center 201 R&D Building

Chengda Pharmaceutical R&D Center 201 R&D Building

location: Jiashan, Zhejiang Construction year: 2022 Construction volume: laboratory investment 2388 yuan, laboratory area 6300 ㎡
上一页
1

Lab Consultation | Planning & Design | Engineering   

Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

Lab Consultation | Planning & Design | Engineering                               Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

DAXPRO