Case study

Case study

Quzhou Research Institute of Zhejiang University
View
Case study

Case study

Suzhou CDC
View
Case study

Case study

Harvard University
View
Case study

Case study

CJ R&D Center, South Korea
View
Longsheng Research Institute

Longsheng Research Institute

location: Shaoxing, Zhejiang Construction year: 2022 Construction volume: the total building area is 154077 ㎡, the land area is 5714.79 ㎡, and the laboratory area is 22120 ㎡
上一页
1

Lab Consultation | Planning & Design | Engineering   

Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

Lab Consultation | Planning & Design | Engineering                               Copyright © 2022 DAXPRO GROUP All rights reserved.  苏ICP备2021034544号-1

DAXPRO