Suzhou Center For Disease Control And Prevention
Coordinates: Suzhou, Jiangsu
Construction year: 2022
Construction volume: The project performance is 92.88 million, the laboratory area is 18,000 square meters, and the floor area is 33,667 square meters. The construction content includes scientific research and training buildings, administrative complex buildings, biological sample banks, microbial laboratory buildings, physical and chemical laboratory buildings, etc., with a total construction area of 78,058 square meters square meters, of which the above-ground construction area is 55,299 square meters, and the underground construction area is 22,759 square meters, with a plot ratio of 1.64. The project adopts green building two-star standard and prefabricated building technology design and construction.
Ningbo Disease Control And Prevention Center
Coordinates: Ningbo, Zhejiang
Construction year: 2022
Construction volume: The total construction area is 50227.26㎡, and the laboratory area is 14000㎡. The construction content includes scientific research training room, administration, microbiology laboratory, physical and chemical laboratory, etc.
Harvard University
Coordinates: Boston, USA
Construction year: 2014-2021
Construction volume: total area: a total of 8 floors 50539 m² / 544000 ft², laboratory area: 18,945 m² / 183,996 ft²
China Grand Canal Museum
Coordinates: Yangzhou, Jiangsu
Construction year: 2021
Construction volume: The total construction area is 79373.59㎡; of which the museum is 74438.32㎡; the Universiade Tower is 4935.27㎡; the laboratory area is 1250 square meters; the project performance is 9.48 million yuan
Chongqing Food And Drug Testing And Research Institute
Coordinates: Chongqing, China
Construction year: 2021
Construction volume: The total investment of the project is 147.2 million yuan, the total land area of the project is 53,749.254 square meters, and the total construction area is 64,800 square meters; the construction area of the project: 26,655 square meters, the experimental room: 13,005 square meters, the construction of a food inspection and testing center, supporting the construction of underground garages and equipment room.