Quzhou Research Institute Of Zhejiang University
Coordinates: Quzhou, Zhejiang
Construction Year: 2021
Construction Volume: Laboratory Area 42,000㎡
Suzhou Center For Disease Control And Prevention
Coordinates: Suzhou, Jiangsu
Construction Year: 2022
Construction Volume: laboratory Area 18,000㎡
Total Area: 78,058㎡
China Grand Canal Museum
Coordinates: Yangzhou, Jiangsu
Construction Year: 2021
Construction Volume: Total Area 79,373.59㎡
Museum Area: 74,438.32㎡
Universiade Tower Area: 4,935.27㎡
Laboratory Area: 1,250㎡
Hubei Minzu University
Coordinates: Enshi, Hubei
Construction year: 2019
Construction volume: the total construction area is about 12288.6 square meters, the number of building floors: the building height is 18.48 meters, the number of floors above the ground is 5 floors, and the partial hanging floor is one floor
Oujiang Laboratory
Coordinates: Wenzhou, Zhejiang
Construction year: 2021
Construction volume: The total construction area is about 240,000㎡, and the laboratory area is 11,000㎡
Suzhou Center For Disease Control And Prevention
Coordinates: Suzhou, Jiangsu
Construction year: 2022
Construction volume: The project performance is 92.88 million, the laboratory area is 18,000 square meters, and the floor area is 33,667 square meters. The construction content includes scientific research and training buildings, administrative complex buildings, biological sample banks, microbial laboratory buildings, physical and chemical laboratory buildings, etc., with a total construction area of 78,058 square meters square meters, of which the above-ground construction area is 55,299 square meters, and the underground construction area is 22,759 square meters, with a plot ratio of 1.64. The project adopts green building two-star standard and prefabricated building technology design and construction.
Lvjing Mansion, No. 199, Tayun Road, Wuzhong District, Suzhou City, Jiangsu Province